Scope of Services

Phase I Environmental Assessments

  • All Phase I ESAs are conducted in accordance with current ASTM Standard E1527
  • Turn-around time of no more than 10 business days

Subsurface Investigations

  • Quick response using in-house drilling equipment and mobile laboratory

Drilling

  • Soil, groundwater and vapor sample collection
  • Monitoring well construction
  • Remediation system installation

Laboratory

  • Real-time analysis and constituent iso-concentration mapping

Remediation Systems

  • Design, installation, and monitoring based on best available technology applied to the site

Regulatory Closure

  • Risk-based evaluations for state NFA determination based on current
  • site conditions or after reduction of contaminant concentrations

Safety and Industrial Hygiene

  • Indoor air quality studies and employee exposure assessments